Partner Article
Ashington engineering firm completes £2.4 million project
Ashington based oil and gas engineering firm FES International has completed a £2.4 million project to design and manufacture 19 diverless bend stiffener connectors (DBSCs) for NOV/Subsea 7.
The DBSCs are to be installed on the CLOV floating production storage and offloading (FPSO) unit, off the west coast of Africa.
The project formed part of the preparations for drilling which began in 2012, with oil production commencing earlier this year.
Managing director of FES International, Rob Anderson said: “We’ve a long-standing relationship with NOV and this is a great example of us delivering another smooth and successful project.
“Usually DBSCs are designed with what’s called ‘female’ latching. For this project we had to amend the design and manufacture the industry’s first ‘male’ latch DBSC. We have got an excellent and experienced team at our North East headquarters that is able to innovate and find solutions. That is the key to our success on projects such as this.”
This was posted in Bdaily's Members' News section by Ellen Forster .
Enjoy the read? Get Bdaily delivered.
Sign up to receive our daily bulletin, sent to your inbox, for free.
AI scepticism is healthy. Inaction isn't.
What does NPPF mean for site price and planning gain?
What new NPPF rules mean for landowners
The hidden cost squeezing Britain's economy
Teesside deserves more than cashback devolution
Construction must be built on commercial discipline
Devolution needs financial firepower to drive growth
The value of creating a stronger careers route
Apprenticeships: Invest in talent or keep chasing it
Are you ready for salary transparency?
Confidence the key to our artificial intelligence future
The missing piece of the puzzle in the NEET crisis