Partner Article
Bespoke Fabrications for Hinkley Point C Modular Accommodation
Flexenergy’s specialist prefabrication expertise has played a key role in a modular village providing a hotel-style living environment for workers at the Hinkley Point C nuclear power station site.
The company, one of the UK’s leading pre-insulated polybutylene pipe specialists, has manufactured bespoke pipe components for heating and hot water distribution systems for the 44 blocks of accommodation, with ensuite bedrooms, housing almost 1,500 operatives on the Hinkley Point C construction site and in Bridgewater, Somerset.
For Flexenergy the project involved providing coiled pipe and prefabricated sections to connect air source heat pumps to the accommodation blocks on the two sites, supplying 110 ‘U’ shaped and 16 ‘L’ shaped fabrications as well as 400 metres of pipe. The sections were assembled and tested before being shipped in batches in line with construction schedules.
Flexenergy’s Sales Director, Sandy Fairley commented: “This has been a significant project, underlining our capabilities for bespoke prefabrication, in this case linked to the provision of heating and hot water to the modular accommodation blocks. The ease of installation, coupled with the pipe’s high thermal efficiency and recyclability, made for an attractive and flexible proposition for the contractors.”
This was posted in Bdaily's Members' News section by Colin Bridgman .
Enjoy the read? Get Bdaily delivered.
Sign up to receive our popular morning National email for free.
It's time to confront the digital poverty crisis
Why a business exit is no longer all or nothing
Culture is the foundation for sustainable growth
Business must help young people take root in work
Purposeful procurement for long-term growth
Time to rethink outdated views on apprenticeships
The scale-ups rocketing through our fast world
Care about the experience, not just the outcome
The rise of an alternative investor model
Bots don't beat personal business coaching
From COVID-19 to the Middle East crisis
How to build credibility in B2B marketing