Hull-based Spencer Group creates maintenance facility at historic railway site
Engineering firm Spencer Group has created a new maintenance facility for East Midlands Trains at the home of Britain’s only surviving rail roundhouse.
The temporary facility, located at Chesterfield’s Barrow Hill rail heritage centre, will operate for around 12 weeks and enable essential upgrades on the wider network of depots and signal systems.
Spencer Group spent 21 weeks working on the project at the privately-owned museum, which also serves as a Network Rail depot.
The complex was built in 1870 and is the UK’s last railway roundhouse building with an operational turntable. The site faced demolition in 1991, but volunteers saved it and turned it into a rail museum and arts centre.
Transport operator East Midlands Trains tasked Spencer Group with designing and building a temporary depot for servicing its Class 222 Meridian and high-speed trains.
Spencer Group project director Joe Bennett said: “We’re a multi-disciplinary company. We take a concept from first principles and bring it to fruition safely, on time and on budget.
“Implementing the construction phase has been a great team effort, with 60 people working on the project.”
Want your business, product or service to be seen regionally and nationally? Bdaily helps you get your story in front of the right audience, every day. Find out how Bdaily can help →
Join more than 55,000 subscribers by signing up to our daily bulletin each morning here.
Enjoy the read? Get Bdaily delivered.
Sign up to receive our popular Yorkshire & The Humber morning email for free.
Are you a meat proxy?
Engaging the five-generation workplace
Talent is an asset, not an operational resource
Taking advantage of the opportunities ahead
Accountability isn’t the enemy of empathy
Act now to avoid a last-minute tax scramble
How inner-city living can transform a city by the sea
Artificial intelligence's value is the time it gives back
Why we must break the magnetic pull of London
AI scepticism is healthy - inaction isn't
What does NPPF mean for planning gain and pricing?
What new NPPF rules mean for landowners