“Historic” Sunderland city centre location transforms into student accommodation
Newcastle based Sendrig Construction is making “good progress” with its total transformation of the old Grade II listed County Court building on John Street, Sunderland where the contractor is creating a 45-unit luxury student accommodation block.
Sendrig, which plans to develop, build and operate the accommodation, purchased the building in 2018. Its design and delivery team has spent the intervening period consulting with local businesses, residents, the planning department and various heritage bodies during the pre-construction phase.
This was done to develop the design, gain planning consent and undertake “exhaustive” surveys given the building’s many heritage assets. John Street occupies a central location within the City of Sunderland, close to Sunderland Museum and Winter Gardens and sits within and contributes to the Sunniside Conservation Area.
Soon it will be home to 33 “generously proportioned” student bedrooms, each with en suite facilities and featuring a communal leisure area, cooking and laundry areas and studies. A further 12 bedrooms form part of a new build extension to the rear of the building, which is accessed by a bridge between the two buildings at first floor level.
The County Court building is situated in a “challenging” location with particularly difficult access constraints. The lane to the rear is very narrow and only wide enough for blue light vehicles and dust carts, while to the front, is a busy city centre pedestrian and bus and route.

This area was also a hot spot during WW2 and there are estimated to be between five and 10 unexploded bombs within the locality, an aspect of the project which alone, has created a great deal of additional consultation and “careful piling”.
Managing director of Sendrig, Michael Lee, believes it is one of the most challenging jobs they have ever worked on. He commented: “We are looking forward confidently to the completion of this project, which will be an impressive, luxury student accommodation building by the end of August, but as a project it is certainly putting us through our paces!
“I should also like to take this opportunity to extend our thanks to Sunderland City Council, which is one of the best local authorities we have worked with and who have been tremendously supportive throughout.”
On project completion, the finished building is expected to set the standard for student accommodation when it welcomes its first students in September 2023. It will make full use of either high tech or SMART technology and the fixtures and fittings will be of a high quality throughout.
Additionally, its location should prove “highly popular”, set within the “historic” conservation area of Sunniside with its popular bars and restaurants and both university campuses being no more than 15 minutes’ walk away.
By Matthew Neville – Senior Correspondent, Bdaily
- Add me on LinkedIn and Twitter to keep up to date
- And follow Bdaily on Facebook, Twitter and LinkedIn
- Submit press releases to editor@bdaily.co.uk for consideration.
Want your business, product or service to be seen regionally and nationally? Bdaily helps you get your story in front of the right audience, every day. Find out how Bdaily can help →
Join more than 55,000 subscribers by signing up to our daily bulletin each morning here.
Enjoy the read? Get Bdaily delivered.
Sign up to receive our daily bulletin, sent to your inbox, for free.
Improving North East transport will improve lives
Unlocking investment potential before year end
Give us certainty to deliver better homes
Hormuz: Safe passage - not insurance - the issue
Don't get caught out by employment law change
When literacy thrives, our businesses thrive too
Building a more diverse construction sector
The value of using data like a Premier League club
Raising the bar to boost North East growth
Navigating the messy middle of business growth
We must make it easier to hire young people
Why community-based care is key to NHS' future